August GHRS Trending Report: Day  95212 - 95246




					           Thermal Summary (deg C) (This Period)



			       Monthly			       Hold  				     Operate
		yel				yel				     Side 1  			      Side 2	
		low	min	avg	max	high		avg		min	avg	max		min	avg	max

RIU A		-20	5	12.5	26.7	35		9.7		6.9	19	26		6.5	15.6	22.3
RIU B		-20	5.8	12.8	28	35		10.1		7.7	18.9	25.7		6.9	17.2	24
DEB Front	-28	-10.8	2.4	41.2	45		-3.5		-9.3	19	41.2		-8.2	20.7	38.5
DEB Rear	-28	-9.6	3.3	40.6	45		-2.7		-7	20.2	38.6		-7.4	21.8	40.6
Detector 1	-5	8.3	12.2	21.4	28		11.2		9.3	14.5	21.4		9.3	12.3	15
Detector 2	-5	7.7	11.3	20.7	28		10.4		9	12.1	15.3		8.7	14.2	20
Digicon 
  Radiator	-18	-3.3	1.1	7	14		0.3		-1.5	2.6	7		-1.5	2.9	7
Optical Bench 
  Bulkhead	6	16.1	18.5	23.2	30		17.9		16.8	19.5	23.2		16.4	19.2	22.5
Pre-amp 1	3	14.1	19.8	46.2	48		17.2		15	33.4	46.2		14.4	17.9	21.4
Pre-amp 2	3	14.4	18.9	45.6	48		16.8		15	19.2	32.1		14.4	34.6	44.4
MEB 1		-25	4.7	14.3	37.5	38		9.3		7.3	30.1	37.5		6.3	19.1	25.8
MEB 2		-25	3.3	11.2	27.1	38		8.2		5.7	18	25		5.3	15	21.8
Carrousel 
  Stator	5	15.7	18.8	25.4	31		18		16.8	20	24.3		16.1	20.1	23.9
Fixture I/F A	-16	-1.1	3.7	10.6	18		3		1	4.9	10.6		1	5.5	10.3
Fixture I/F B	-19	-2.6	0.9	4.3	11		0.6		-1.1	1.6	4		-1.5	2	4.3
Fixture I/F C	-24	-7.4	-1.5	8.3	16		-2.7		-5.2	0.7	8		-5.2	1.6	8.3