Table  GHRS-T2

September GHRS Trending Report: Day  94241 - 94275

					                                      Thermal Summary (deg C) (This Period)

			       Monthly			       Hold  				     Operate
		yel				yel				     Side 1  			      Side 2	
		low	min	avg	max	high		avg		min	avg	max		min	avg	max

RIU A		-20	6.2	9.6	24.3	35		8.6		7.3	15.5	22.7		7.3	12.5	19.6
RIU B		-20	6.5	10	24	35		8.9		7.3	14	21.7		8.5	15.7	22.3
DEB Front	-28	-9.6	-2.9	33.8	45		-5.9		-6.7	18.2	31.7		-8.5	14.1	33.8
DEB Rear	-28	-8.9	-2.1	34.6	45		-5.1		-6.3	19.6	32.5		-7.4	15.2	34.6
Detector 1	-5	8.3	10.6	16.8	28		10.2		9.3	12.2	15.7		9	11.2	15.7
Detector 2	-5	8	10.2	17.9	28		9.6		8.7	11.5	14.4		8.7	12.6	17.5
Digicon 
  Radiator	-18	-3.3	0	5.3	14		-0.5		-2.2	1.2	3.7		-1.8	1.1	5.3
Optical Bench 
  Bulkhead	6	16.1	17.6	21.1	30		17.2		16.4	18.4	20.4		16.4	18.4	20.7
Pre-amp 1	3	14.1	16.7	39.5	48		15.8		14.7	30.6	39.5		14.7	16.8	22.9
Pre-amp 2	3	14.4	17.3	41.2	48		15.9		15.4	20.1	32.5		14.7	31.4	41.2
MEB 1		-25	5.7	9.9	35.5	38		8.2		7.7	26.8	34.2		6.7	16	22.9
MEB 2		-25	4.3	8.2	22.5	38		7		6.3	14.5	21.4		5.7	11.9	18.2
Carrousel 
  Stator	5	15.7	17.6	22.1	31		17.2		16.4	18.8	21.1		16.1	18.8	21.8
Fixture I/F A	-16	-0.4	2.5	8.3	18		2		1	3.4	5.7		0.7	3.6	7.7
Fixture I/F B	-19	-1.8	0.3	4	11		0		-1.1	0.4	2		-1.1	0.6	4
Fixture I/F C	-24	-7	-3.1	5.7	16		-3.8		-5.6	-0.8	3.3		-5.6	-1	5.3