! File: 4783C.PROP ! Database: PEPDB ! Date: 23-FEB-1994:03:18:04 coverpage: title_1: DF-224 VERSION 8.3 FS INSTALLATION proposal_for: ENG/SC pi_fname: LESLYE pi_lname: BOYCE pi_inst: CODE 441 pi_country: USA num_pri: 1 ! end of coverpage abstract: line_1: DF 224 Version 8.3 has been defined to include line_2: the recentering algorithms. It is designed to line_3: improve the loss of lock performance during line_4: fine lock observations. ! ! end of abstract general_form_proposers: lname: BOYCE fname: LESLYE inst: GFSC/CODE 441 country: USA esa: X ! lname: ANDERSON fname: GREG inst: J&T/440.8 country: USA esa: X ! lname: JACOBSEN fname: BILL inst: LMSC/441 country: USA esa: X ! ! end of general_form_proposers block general_form_text: question: 2 section: 1 line_1: The time allocated will provide the specific line_2: vehicle configuration and dedicated ScT for line_3: installation and regression testing of Version line_4: 8.3 FS modifications. The new flight code once line_5: installed and validated via on-orbit regression line_6: test, will provide new capability. The specific line_7: HST configuration for installation of this flight line_8: code is needed to configure trhe vehicle, reduce line_9: the CPU processing during installation and perform line_10: regression test. ! question: 3 section: 1 line_1: INSTALLATION line_2: Establish and verify initial S/C configuration. line_3: Load flight code changes, dump and verify, and line_4: install. Vehicle attitude: RA 261D, DEC 32D line_8: vehicle configuration: DF 224 8.1.2 NSSC1 4.0.A and PDB line_9: 29.A must be the configuratin prior to installation of line_11: DF 224 8.3. The HST shall be in normal mode using the line_12: gyros for attitude reference. 4 Kbps "AN" format should line_13: be active, with the engineering recorder activities line_14: performed by generic scheduling by PASS. The following line_15: FSW processing must be disabled prior to installation: line_16: 1) FGS acquistion, ATTITUDE Maps/updates, Command line_17: Packets 33-47 Disabled; line_18: 2) FHST processing should be inactive, command packets line_19: 31 & 32. ! question: 3 section: 2 line_1: SSAF Comcon requests should be included in the SMS of 15 to line_2: 20 minutes duration each for a total of 2 per orbit. A full line_3: DF 224 memory Dump will follow installation. All eng data line_4: will be recovered either in R/T or via the ETR. line_6: Time Requirement: 2 orbits dedicated line_8: REGRESSION TEST line_9: The regression test activities are defined to be the line_11: minimum activities required to assess the vehicle H&S. line_12: The majority of the regression test items are autonomously line_13: performed by the DF 224 FSW as a result of vehicle line_14: configuration. The activities have been defined and line_15: success/fail criteria established. Specific activities line_16: that are to be scheduled via the SMS are the following seq line_17: 1) CT Observation that includes a crossover of an line_18: occultation boundary; 2) FL Acq that includes a cross line_19: over of an occultation boundary. 3) FL Reacq that also line_20: includes a crossover of an occultation boundary. line_21: 4) Type 2 Slew to the +V3 sunpoint attitude. 5) FL Obs line_22: w/ occult boundary crossover 6) FL Reacq... 7) FL Reacq line_23: Vehicle attitude: +V3 Sunpoint RA 8D DEC 25D ! question: 3 section: 3 line_1: Vehicle configuration: 4 Kbps AN format should be active line_2: with the ETR activities performed by PASS. During this line_3: period Operations will be switching between 4K AN, and line_4: 32K FN and PN. SSAF comcons will be requested 2 per line_5: orbit 15-20 mins each in SMS. All eng data will be line_6: recorded in R/T or on ETR. line_8: Time Required: 6 Orbits line_11: CONTIGENCY REMOVAL line_16: Time Required: 2 Orbits ! question: 4 section: 1 line_1: Due to the complexity of this DF-224 FS installation, line_2: dedicated ScT is needed to reduce the CPU processing line_3: and prevent unknown anomalous FSW operation, possibly line_4: causing entry into safemode. Previously, serendipitous line_5: installations of FSW code have proved to be difficult line_6: when specific vehicle configurations are desired. line_7: Project Office, Code 440 has therefore directed that all line_8: future FSW installations requiring specific vehicle line_9: configurations be submitted through the proposal system. ! question: 5 section: 1 line_1: 10 Orbits is requested to begin on or about 004/1100. line_2: The use of this time is described as follows: line_3: Day ORBIT Content line_4: ORBIT Description line_5: 1 Establish and verify initial S/C configuration, line_6: load flight code changes. line_7: 2 Dump and verify code changes and install, Enable line_8: recentering capability and verify line_9: 3 CT Acq w/ crossover of occultation boundary line_10: 4 FL Acq w/ crossover of occultation boundary line_11: Use new GS Pair to get a new Pointing line_12: 5 FL Reacq w/ crossover of occultation boundary line_13: 6 Type 2 Slew to +V3 Sunpoint, FL Observations line_14: 7 FL Reacq w/ crossover of occultation boundary line_15: 8 FL Reqcq w/ crossover of occultation boundary line_16: 9 Contingency Removal of Code line_17: 10 Contingency Dump & Verify ! question: 6 section: 1 line_1: 2 SSAF Comcon requests of 15-20 minutes duration each line_2: for all orbits. Installation of the FS modifications line_3: will be conducted with the HST in normal mode using line_4: gyros for attitude reference; and specific DF-224 line_5: processing disabled (ie FHST, FGS) line_7: The following R/T and merge operations are required to line_8: completed the installation and regression test: line_11: MOC MERGE, R/T Activities line_12: 1) Establish initial configuration by disabling velocity line_13: aberration and parallax processing line_14: 2) Block loading (TMDIAG) line_15: 3) Verification of initial configuration for installation line_16: 4) Memory Dump and analysis line_17: 5) Enable Recentering Algorithms line_19: MOC Merge, SPC Activities line_20: 1) Possible edit and/or deletion of FHST updates and maps line_21: 2) Possible edit and/or deletion of splines from SMS line_22: 3) ETR scheduling line_23: 4) Activation and processing of 32 & 4K telemetry ! !end of general form text general_form_address: lname: BOYCE fname: LESLYE category: PI inst: CODE 441 phone: 301 286-8219 ! ! end of general_form_address records fixed_targets: targnum: 1 name_1: TG1 descr_1: TARGET 1 pos_1: RA = 261.0D +/- .1", pos_2: DEC = 32.0D +/- .01" equinox: 1993 ! targnum: 2 name_1: V3SUNPOINT descr_1: PLUS V3 TO SUNPOINT pos_1: RA = 8.0D +/- .1", pos_2: DEC = 25.0D +/- .01" equinox: 1993 ! ! end of fixed targets ! No solar system records found ! No generic target records found exposure_logsheet: linenum: 2.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: CYCLE 2 / 2-23; req_4: SEQ 2-3 NO GAP comment_1: NO FGS, NO FHST MAPS/UPDATES, COMMAND comment_2: PACKETS 31-47 DISABLED, BEGIN FS CODE comment_3: CHANGES INSTALLATION VIA RTC; ORBIT 1 ! linenum: 3.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; comment_1: NO FGS, NO FHST MAPS/UPDATES, COMMAND comment_2: PACKETS 31-47 DISABLED, BEGIN FS CODE comment_3: CHANGES INSTALLATION VIA RTC; ORBIT 1 ! linenum: 4.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: SEQ 4-5 NO GAP comment_1: NO FGS, NO FHST MAPS/UPDATES, COMMAND comment_2: PACKETS 31-47 DISABLED, BEGIN FS CODE comment_3: CHANGES, INSTALLATION VIA RTC; ORBIT 2 ! linenum: 5.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; comment_1: NO FGS, NO FHST MAPS/UPDATES, COMMAND comment_2: PACKETS 31-47 DISABLED, BEGIN FS CODE comment_3: CHANGES, INSTALLATION VIA RTC; ORBIT 2 comment_4: DUMP AND VERIFY ! linenum: 6.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=FGS, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: SEQ 6-8 NO GAP; req_4: PCS MODE C; comment_1: CT OBS W/ CROSSOVER OF comment_2: OCCULTATION BOUNDARY (ORBIT 3) ! linenum: 8.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=FGS, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_4: PCS MODE F; comment_1: FL OBS W/ CROSSOVER OF comment_2: OCCULTATION BOUNDARY (ORBIT 4) comment_3: USE DIFFERENT GS PAIR FROM CT comment_4: TO PROVIDE ANOTHER POINTING ! linenum: 10.000 targname: TG1 config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=FGS, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: SEQ 10-12 NO GAP; req_4: PCS MODE F; comment_1: FL REACQ W/ CROSSOVER OF comment_2: OCCULTATION BOUNDARY (ORBIT 5) ! linenum: 12.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=FGS, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_4: PCS MODE F; comment_1: TYPE 2 SLEW FL ACQ W/ CROSSOVER comment_2: OF OCCULTATION BOUNDARY ORBIT 6 ! linenum: 14.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=FGS, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: SEQ 14-16 NO GAP; req_4: PCS MODE F; comment_1: FL REACQ W/ CROSSOVER OF comment_2: OCCULTATION BOUNDARY ORBIT 7 ! linenum: 16.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=FGS, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_4: PCS MODE F; comment_1: FL REACQ W/ CROSSOVER OF comment_2: OCCULTATION BOUNDARY ORBIT 8 ! linenum: 20.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: SEQ 20-21 NO GAP comment_1: CONTINGENCY ORBIT 9 comment_2: 20 MINUTE COMCON ! linenum: 21.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; comment_1: CONTINGENCY ORBIT 9 comment_2: 20 MINUTE COMCON ! linenum: 22.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: SEQ 22-23 NO GAP comment_1: CONTINGENCY ORBIT 10 comment_2: 20 MINUTE COMCON ! linenum: 23.000 targname: V3SUNPOINT config: S/C opmode: DATA aperture: V1 num_exp: 1 time_per_exp: 20M fluxnum_1: 1 priority: 1 param_1: CONTROL=GYRO, req_1: RT ANALYSIS; req_2: REQ UPLINK; req_3: PCS MODE F; comment_1: CONTINGENCY ORBIT 10 comment_2: 20 MINUTE COMCON ! ! end of exposure logsheet ! No scan data records found