Page 1 PROPOSAL FOR HUBBLE SPACE TELESCOPE OBSERVATIONS ST ScI Use Only ID 4215c Report Date: 09-May-96:19:26 Version: ********** Check-in Date: ********** 1.Proposal Title: FGS ITS TEST ------------------------------------------------------------------------------------ 2. Scientific Category 3. Proposal For 4. Proposal Type 5. Continuation ID ENG/FGS Sub Category ------------------------------------------------------------------------------------ 6. Principal Investigator Institution Country Telephone Art Bradley MOC USA (301)286-2874 ------------------------------------------------------------------------------------ 7. Abstract This proposal reserves time in the SMS for the MOC to merge in the FGS internal test source test. The test is to be scheduled as a "snapshot", so that it does not interfere with prime science scheduling. It is to be scheduled with 3 SUs every other week. The MOC will determine which FGSs to actually test via their merge SMS. ------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------ 9. Est obs time (hours) pri: 5.80 par: 0 10. Num targs pri: 1 par: 0 ------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------ Page 2 I. GENERAL FORM Proposal 4215c PI: Art Bradley Proposal Title: FGS ITS TEST ------------------------------------------------------------------------------------ 1. Proposers: Proposers Institution Country ESA ------------------------------------------------------------------------------------ Art Bradley MOC USA ------------------------------------------------------------------------------------ 3. Description of proposed observations. This test measures the stability of the FGS internal test sources. ------------------------------------------------------------------------------------ 5. Description of special scheduling requirements. The test will require 3 twenty minute gyro guided SUs every other week. ------------------------------------------------------------------------------------ 7. Data reduction and analysis plans. The data will be reduced by HDOS/MOC ------------------------------------------------------------------------------------ 11. Address Information Name: ART BRADLEY Category: PI Institution: MOC Address: City: State: Zip Code: Country: Telephone: Telex (or e-mail): ------------------------------------------------------------------------------------ EXPOSURE LOGSHEET ID = 4215c [ 3] ------------------------------------------------------------------------------------------------------------------------------------ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |10 | 11 | 12 |13 |14| 15 ------------------------------------------------------------------------------------------------------------------------------------ Line | Seq | Target |Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | S/N |Flx|Pr| Special Number | Name | Name |Config| Mode |or FOV |Element |Waveln.| Parameters |Exp| |Rel. Time|Ref| | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 ANTI-SUN S/C POINTIN V1 CONTROL=GYRO 1 20M 1 1 REPEAT 1-3 EVERY G 14D +/- 7D FOR 9 MORE TIMES CYCLE 2 / 1-3 COND IF A GROUP 1-3 WITHIN Comments: COND IF'S USED TO FORCE EACH 7D LOG LINE INTO NEW SU, NO NEED TO CONTACT OBSERVER TO SCH. ------------------------------------------------------------------------------------------------------------------------------------ 2 ANTI-SUN S/C POINTIN V1 CONTROL=GYRO 1 20M 1 1 COND IF B G ------------------------------------------------------------------------------------------------------------------------------------ 3 ANTI-SUN S/C POINTIN V1 CONTROL=GYRO 1 20M 1 1 COND IF C G ------------------------------------------------------------------------------------------------------------------------------------ Summary Form for Proposal 4215c [ 4] Item Used in this proposal ------------------------------------------------------------------------------------------------------------------------------------ Configurations S/C ------------------------------------------------------------------------------------------------------------------------------------ Opmodes POINTING ------------------------------------------------------------------------------------------------------------------------------------ Optional Parameters CONTROL=GYRO ------------------------------------------------------------------------------------------------------------------------------------ Proposal for ENG/FGS ------------------------------------------------------------------------------------------------------------------------------------ S/C Hours 5.80 ------------------------------------------------------------------------------------------------------------------------------------ Scientific Category ------------------------------------------------------------------------------------------------------------------------------------ Scientific Sub-category ------------------------------------------------------------------------------------------------------------------------------------ Special Requirements REPEAT 1-3 EVERY 14D +/- 7D FOR 9 MORE TIMES; CYCLE 2 / 1-3; COND IF A; GROUP 1-3 WITHIN 7D; COND IF B; COND IF C; ------------------------------------------------------------------------------------------------------------------------------------ Spectral Elements ------------------------------------------------------------------------------------------------------------------------------------ Target Names ------------------------------------------------------------------------------------------------------------------------------------